OUR WORKS FOR A COGEN PLANT IN THAILAND INCLUDES:-


- Gas Pipes
- Cooling Tower Pipes
- Steam Pipes
- Compressed air pipes
- Heat Exchanger Pipes
- Absorption Chiller Pipes
- Gas Compressor and Air Tanks

We were awarded a turnkey project to install piping works at a factory in Thailand for a Co generation Plant generating 7.5MW electricity.
Steam Pipes, Gas Pipes, Compressed air pipes, Cooling tower pipes, heat exchanger pipes, hot water pipes ranging from 1/2" to 14" was used for this project.
Steam pipes and Gas Pipes are all 100% XRay and tested. Read More Here


GAS PIPING
These gas pipes are 100% RT tested. The high pressure gas requires seamless pipes.
COOLING TOWER PIPES
These cooling tower pipes are 14" in Diameter and supplies cool water to the absorption chiller.


COMPRESSED AIR PIPES
These air pipes are high pressured air and is delivered to the gas turbine.

GAS PIPES
These Gas supplied from PTT delivered to Gas compressor engine.
Pipes are Seamless with 100% Radiography Test on the pipings.

COOLING TOWER AND HOT WATER PIPES
These pipes are delivered from the absorption chiller to the heat exchanger and cooling tower.

AIR VENT AND DRAIN PIPES
All air vent and drain pipes from Gas Turbines, Boilers, Compressor, Economizers, Heat Exchangers, etc are discharged externally.

Steam Pipes, Gas Pipes, Compressed air pipes, Cooling tower pipes, heat exchanger pipes, hot water pipes ranging from 1/2" to 14" was used for this project.
Steam pipes and Gas Pipes are all 100% XRay and tested. Read More Here
GAS PIPING
These gas pipes are 100% RT tested. The high pressure gas requires seamless pipes.
COOLING TOWER PIPES
These cooling tower pipes are 14" in Diameter and supplies cool water to the absorption chiller.
COMPRESSED AIR PIPES
These air pipes are high pressured air and is delivered to the gas turbine.
GAS PIPES
These Gas supplied from PTT delivered to Gas compressor engine.
Pipes are Seamless with 100% Radiography Test on the pipings.
COOLING TOWER AND HOT WATER PIPES
These pipes are delivered from the absorption chiller to the heat exchanger and cooling tower.
AIR VENT AND DRAIN PIPES
All air vent and drain pipes from Gas Turbines, Boilers, Compressor, Economizers, Heat Exchangers, etc are discharged externally.
GAS COMPRESSOR TANK
Fabrication of gas storage tank c/w RT Test 100%.
AIR COMPRESSOR TANK
. Fabrication of air compressor tank
Seal Air Buffer Tank.
STEAM PIPES
Steam pipes from boiler to Header. Background is the economizer. Steam Pipes are 100% RT Tested and Seamless ERW pipes.
ABSORPTION CHILLER PIPES
All the piping from equipments to Absorption chiller and back to Equipments.